{"id":16215,"date":"2025-06-15T21:48:05","date_gmt":"2025-06-15T19:48:05","guid":{"rendered":"https:\/\/pruebas.creativesur.es\/?page_id=16215"},"modified":"2025-06-17T00:26:37","modified_gmt":"2025-06-16T22:26:37","slug":"parque-eolico-offshore-saint-brieuc","status":"publish","type":"page","link":"https:\/\/iprocel.com\/en\/parque-eolico-offshore-saint-brieuc\/","title":{"rendered":"Saint Brieuc Offshore Wind Farm"},"content":{"rendered":"<h1>Saint Brieuc Offshore Wind Farm<\/h1>\n<h1>Scope of the project<\/h1>\n<div>\n<p>IPROCEL has actively participated in the development of the Saint Brieuc Offshore Wind Farm, with an installed capacity of 496 MW, promoted by Iberdrola off the coast of Brittany, France. Completed in 2025, this project is one of the largest offshore wind developments in Europe and represents a key milestone in the country's energy transition.<br \/>Our scope has encompassed highly specialised coordination, supervision and support services in commissioning activities, covering multiple systems and project infrastructures:<br \/>- Offshore substation: coordination and supervision of the commissioning of the main systems, guaranteeing the operability of the equipment and its integration with the global system.<br \/>- Wind turbines: technical supervision of the contractor's activities, verification of signals and coordination with safety teams to ensure smooth and efficient commissioning.<br \/>- SCADA system: management of the commissioning process in the onshore environment, support in the integration with the customer's CORE, supervision of export cable testing and commissioning of the systems in port facilities.<br \/>- Testing and acceptance: participation in factory acceptance testing (FAT) and technical support during the commissioning of the offshore substation, the onshore substation and the turbine pre-assembly phase, until final commissioning at the offshore site.<br \/>With its participation in Saint Brieuc, IPROCEL consolidates its experience in the offshore sector, demonstrating its capacity to tackle projects of high technical complexity in demanding environments and reinforcing its position as a reference partner in the commissioning of large offshore wind farms at an international level.<\/p>\n<\/div>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/2025\/06\/9.-Eolica-Offshore-St.-Brieuc-Foto-2-1.png\" alt=\"\"><br \/>\n[bolt]<\/p>\n<h1>Power<\/h1>\n<div>\n<p>496 MW<\/p>\n<\/div>\n<p>[location]<\/p>\n<h2>Location<\/h2>\n<div>\n<p>France<\/p>\n<\/div>\n<p>[user]<\/p>\n<h2>Customer<\/h2>\n<div>\n<p>Iberdrola<\/p>\n<\/div>\n<p><p>\n        <a href=\"\/en\/proyectos\/\">See all projects<\/a>\n    <\/p>\n<\/p>\n<p><!--more--><br \/>\n<!-- {\"type\":\"layout\",\"children\":[{\"type\":\"section\",\"props\":{\"header_transparent\":true,\"header_transparent_noplaceholder\":false,\"height\":\"viewport\",\"height_viewport\":60,\"image\":\"wp-content\\\/uploads\\\/2025\\\/06\\\/3.jpg\",\"image_position\":\"bottom-center\",\"image_size\":\"cover\",\"media_overlay\":\"rgba(0, 0, 0, 0.24)\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"large\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Parque E\\u00f3lico Offshore Saint Brieuc\",\"css\":\".el-element{\\n    color: #fff;\\n}\\n\",\"text_align\":\"center\",\"title_element\":\"h1\",\"title_style\":\"heading-medium\"}}]}]}]},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"large\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-2\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Alcance\\u00a0del\\u00a0proyecto\",\"title_element\":\"h1\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>IPROCEL ha participado activamente en el desarrollo del Parque E\\u00f3lico Offshore Saint Brieuc, de 496\\u202fMW de potencia instalada, promovido por Iberdrola frente a la costa de Breta\\u00f1a, en Francia. Finalizado en 2025, este proyecto es uno de los mayores desarrollos e\\u00f3licos marinos en Europa y representa un hito clave en la transici\\u00f3n energ\\u00e9tica del pa\\u00eds.<br \\\/>Nuestro alcance ha abarcado servicios altamente especializados de coordinaci\\u00f3n, supervisi\\u00f3n y soporte en actividades de puesta en marcha, cubriendo m\\u00faltiples sistemas e infraestructuras del proyecto:<br \\\/>- Subestaci\\u00f3n Offshore: coordinaci\\u00f3n y supervisi\\u00f3n de los trabajos de puesta en marcha de los sistemas principales, garantizando la operatividad de los equipos y su integraci\\u00f3n con el sistema global.<br \\\/>- Aerogeneradores: supervisi\\u00f3n t\\u00e9cnica de las actividades del contratista, verificaci\\u00f3n de se\\u00f1ales y coordinaci\\u00f3n con los equipos de seguridad para asegurar una puesta en marcha eficiente y sin incidencias.<br \\\/>- Sistema SCADA: gesti\\u00f3n del proceso de puesta en marcha en el \\u00e1mbito onshore, soporte en la integraci\\u00f3n con el CORE del cliente, supervisi\\u00f3n de pruebas del cable de exportaci\\u00f3n y comisionado de los sistemas en instalaciones portuarias.<br \\\/>- Pruebas y aceptaci\\u00f3n: participaci\\u00f3n en las pruebas de aceptaci\\u00f3n en f\\u00e1brica (FAT) y apoyo t\\u00e9cnico durante el comisionado de la subestaci\\u00f3n offshore, la subestaci\\u00f3n onshore y la fase de preensamblaje de turbinas, hasta la puesta en marcha final en el emplazamiento marino.<br \\\/>Con su participaci\\u00f3n en Saint Brieuc, IPROCEL consolida su experiencia en el sector offshore, demostrando su capacidad para abordar proyectos de alta complejidad t\\u00e9cnica en entornos exigentes y reforzando su posici\\u00f3n como socio de referencia en la puesta en marcha de grandes instalaciones e\\u00f3licas marinas a nivel internacional.<\\\/p>\",\"margin\":\"default\",\"text_align\":\"justify\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"vertical_align\":\"bottom\",\"width_medium\":\"1-2\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\\\/uploads\\\/2025\\\/06\\\/9.-Eolica-Offshore-St.-Brieuc-Foto-2-1.png\",\"image_height\":800,\"image_svg_color\":\"emphasis\",\"image_width\":800,\"margin\":\"default\"}}]}],\"props\":{\"column_gap\":\"large\",\"layout\":\"1-2,1-2\"}}]},{\"type\":\"section\",\"props\":{\"css\":\".el-section{\\n    background-color: #013ca6;\\n}\",\"image_position\":\"center-center\",\"padding\":\"small\",\"padding_remove_bottom\":false,\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"column_gap\":\"small\",\"layout\":\"1-3,1-3,1-3\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"icon\",\"props\":{\"css\":\".el-element{\\n    color: #fff;\\n}\\n\",\"icon\":\"bolt\",\"icon_width\":\"90\",\"margin\":\"default\",\"text_align\":\"center\"}},{\"type\":\"headline\",\"props\":{\"content\":\"Potencia\",\"css\":\".el-element{\\n    color: #fff;\\n}\",\"margin_remove_bottom\":true,\"margin_remove_top\":true,\"text_align\":\"center\",\"title_element\":\"h1\",\"title_style\":\"h2\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>496 MW<\\\/p>\",\"css\":\".el-element{\\n    font-size:30px;\\n    color: #fff;\\n}\\n\",\"margin\":\"default\",\"margin_remove_top\":true,\"text_align\":\"center\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"vertical_align\":\"middle\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"icon\",\"props\":{\"css\":\".el-element{\\n    color: #fff;\\n}\",\"icon\":\"location\",\"icon_width\":\"90\",\"margin\":\"default\",\"text_align\":\"center\"}},{\"type\":\"headline\",\"props\":{\"content\":\"Localizaci\\u00f3n\",\"css\":\".el-element{\\n    color: #fff;\\n}\",\"margin_remove_bottom\":true,\"margin_remove_top\":true,\"text_align\":\"center\",\"title_element\":\"h2\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>Francia<\\\/p>\",\"css\":\".el-element{\\n    font-size:30px;\\n    color: #fff;\\n}\\n\",\"margin\":\"default\",\"margin_remove_top\":true,\"text_align\":\"center\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"vertical_align\":\"middle\",\"width_medium\":\"1-3\"},\"children\":[{\"type\":\"icon\",\"props\":{\"css\":\".el-element{\\n    color: #fff;\\n}\",\"icon\":\"user\",\"icon_width\":\"90\",\"margin\":\"default\",\"text_align\":\"center\"}},{\"type\":\"headline\",\"props\":{\"content\":\"Cliente\",\"css\":\".el-element{\\n    color: #fff;\\n}\",\"margin_remove_bottom\":true,\"margin_remove_top\":true,\"text_align\":\"center\",\"title_element\":\"h2\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>Iberdrola<\\\/p>\",\"css\":\".el-element{\\n    font-size:30px;\\n    color: #fff;\\n}\\n\",\"margin\":\"default\",\"margin_remove_top\":true,\"text_align\":\"center\"}}]}]},{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"button\",\"props\":{\"css\":\".el-content{\\n    color: #fff;\\n    }\",\"grid_column_gap\":\"small\",\"grid_row_gap\":\"small\",\"margin\":\"default\",\"margin_remove_bottom\":false,\"maxwidth\":\"large\"},\"children\":[{\"type\":\"button_item\",\"props\":{\"button_style\":\"\",\"content\":\"Ver todos los proyectos\",\"dialog_layout\":\"modal\",\"dialog_offcanvas_flip\":true,\"icon\":\"arrow-right\",\"icon_align\":\"right\",\"link\":\"\\\/proyectos\"}}]}]}]}]}],\"version\":\"4.5.17\"} --><\/p>","protected":false},"excerpt":{"rendered":"<p>Parque E\u00f3lico Offshore Saint Brieuc Alcance\u00a0del\u00a0proyecto IPROCEL ha participado activamente en el desarrollo del Parque E\u00f3lico Offshore Saint Brieuc, de 496\u202fMW de potencia instalada, promovido por Iberdrola frente a la costa de Breta\u00f1a, en Francia. Finalizado en 2025, este proyecto es uno de los mayores desarrollos e\u00f3licos marinos en Europa y representa un hito clave [&hellip;]<\/p>","protected":false},"author":2,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-16215","page","type-page","status-publish","hentry"],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/pages\/16215","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/comments?post=16215"}],"version-history":[{"count":4,"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/pages\/16215\/revisions"}],"predecessor-version":[{"id":16648,"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/pages\/16215\/revisions\/16648"}],"wp:attachment":[{"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/media?parent=16215"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}