{"id":17089,"date":"2023-12-19T13:58:01","date_gmt":"2023-12-19T12:58:01","guid":{"rendered":"https:\/\/pruebas.creativesur.es\/?p=17089"},"modified":"2025-06-22T23:58:21","modified_gmt":"2025-06-22T21:58:21","slug":"iberdrola-adjudica-a-iprocel-los-servicios-de-ingenieria-de-la-propiedad-y-direccion-facultativa-del-proyecto-fotovoltaica-escatron-50-mw","status":"publish","type":"post","link":"https:\/\/iprocel.com\/en\/iberdrola-adjudica-a-iprocel-los-servicios-de-ingenieria-de-la-propiedad-y-direccion-facultativa-del-proyecto-fotovoltaica-escatron-50-mw\/","title":{"rendered":"IBERDROLA awards IPROCEL the property engineering and project management services for the Escatr\u00f3n 50 MW photovoltaic project."},"content":{"rendered":"<p class=\"wp-block-paragraph\">IBERDROLA awards IPROCEL the property engineering services (engineering supervision, civil works, electromechanical assembly, electrical infrastructure, supply, procurement and assembly of components and commissioning, both for the wind farm and the evacuation infrastructure) and project management of the Escatr\u00f3n 50 MW photovoltaic plant in Aragon. With this award, the company consolidates its presence in the region, where it was also recently awarded the same contract for the Pe\u00f1aflor (120 MW) and Fuendetodos (125 MW) photovoltaic projects.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><br>This project is part of the framework contract signed in 2020 with IBERDROLA to carry out the services of project management, site management and supervision of the areas of civil works, electromechanical assembly, commissioning, health and safety, quality and environment, topography and contract management, both in photovoltaic plants and wind farms.<\/p>","protected":false},"excerpt":{"rendered":"<p>IBERDROLA adjudica a IPROCEL los servicios de ingenier\u00eda de la propiedad (supervisi\u00f3n de la ingenier\u00eda, obra civil, montaje electromec\u00e1nico, infraestructura el\u00e9ctrica, suministro, acopio y montaje de componentes y puesta en marcha, tanto para el parque e\u00f3lico como la infraestructura de evacuaci\u00f3n)&nbsp; y direcci\u00f3n facultativa de la planta fotovoltaica Escatr\u00f3n 50 MW, en Arag\u00f3n. Con esta [&hellip;]<\/p>","protected":false},"author":2,"featured_media":17090,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-17089","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-sin-categoria"],"jetpack_featured_media_url":"https:\/\/iprocel.com\/wp-content\/uploads\/2025\/06\/o_1ine4ut2p18l71u9qhuc19481il8a.jpeg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/posts\/17089","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/comments?post=17089"}],"version-history":[{"count":1,"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/posts\/17089\/revisions"}],"predecessor-version":[{"id":17091,"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/posts\/17089\/revisions\/17091"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/media\/17090"}],"wp:attachment":[{"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/media?parent=17089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/categories?post=17089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/iprocel.com\/en\/wp-json\/wp\/v2\/tags?post=17089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}